● Live · Trickett House · Stage 5RIBA 4–5NBSSHF · LDN
Start a brief →0
Packages found in archive
0
Drawing PDFs indexed
0
Client groups identified
Next opening
Selected work
All projects →Trickett House
2026 · LONDON
Fusilier / Northvale Construction · Stage 5 drafting, drawing review and window schedule support for Sutton Housing Society flats.
Otterfield, Yiewsley
2025 · YIEWSLEY
MBCS / Hunters Architects · Wall, floor, ceiling and roof type package with cladding and structural coordination for Bugler.
Bellway Artisan Housetypes
2025 · NHC
MBCS / Bellway Group Technical · Site plan and house-type working drawing updates for timber-frame and masonry packs.
Tattenhoe Park
2025 · MILTON KEYNES
MBCS / Bellway Homes Northern Home Counties · GA and setting-out plans for the TP5-C closed-panel timber-frame house type.
12 Rowlatt Drive
2026 · ST ALBANS
Argento Design Studio · Planning package covering existing/proposed plans, elevations, site and block plans for a house extension.
On the practice
A building is the sum of its junctions.
The rest is marketing.
No mood boards, no renderings. Drawings that turn permission into a buildable thing without a clipboard of RFIs.
Every detail is drawn at the scale a tradesperson actually needs. 1:5 at thresholds, 1:10 elsewhere.
We work with architects who'd rather be designing, contractors who want a clean set, clients who've been quoted twice for the same job.